How Long Does an Electrical Panel Upgrade Take?

Upgrading your electrical panel is an essential first step, regardless of whether you're having frequent power surges, flickering lights, or arranging a remodel that calls for more electrical capability. However, many homeowners hesitate due to concerns about the time it takes.

In this blog post, our professionals from Mr. Electric will delve into the process and explore how long an electrical panel upgrade typically takes, involving the expertise of an electrician and electrical repair service.

Initial Assessment and Planning

An experienced electrician will thoroughly inspect your existing electrical panel and the electrical requirements of your property before any repair is done. Determining the extent of the upgrade and any potential issues requires doing this first step. The design process is influenced by various factors, including your home's size, the wiring that is already in place, and the power needs of your equipment. Depending on the project's complexity, this assessment and planning stage usually takes a few hours to a day.

Permit Acquisition

Most jurisdictions require permissions from the local building authority in order to upgrade an electrical panel. By following this procedure, the work is guaranteed to adhere to building codes and safety laws. Even though getting permissions might not directly affect the electrician, it's an important step that extends the timetable. This process may take a few days to a few weeks, depending on the demand and how well the permission office operates.

Preparation and Procurement

The electrician must get ready for the update after the assessment is finished and permits are secured. This involves purchasing the supplies needed, including the new electrical panel, wiring, circuit breakers, and any other parts needed for the installation. The amount of time needed for preparation can change depending on things like material availability and supplier schedule. This stage usually takes a few days to a week.

Installation Process

The most important part of the upgrade procedure is installing the new electrical panel. This stage can take a whole day or many days to finish, depending on the intricacy of the upgrade and any unanticipated issues. The electrician will make sure everything is working properly and in compliance with code by carefully unplugging the old panel, installing the new panel, and rewiring the circuits. Safety is the top priority during this process, and the electrician will take all reasonable steps to avoid mishaps or electrical system damage to your house.

Inspection and Testing

The local building authority will need to inspect the electrical work after it is installed. This inspection guarantees that all safety and code criteria are met by the update. Inspections usually take place a few days after the installation is finished, though the exact date can change based on schedule and inspector availability. Following a successful inspection, the electrician will carry out extensive testing to guarantee that the new panel is operating correctly and that every circuit is operating as planned.

Finalization and Cleanup

The electrician will finish the installation by marking circuits, fastening wiring, and making sure everything is neat and orderly after the inspection and testing are over. During this finalization step, any minor tweaks or adjustments that are required to maximize the electrical panel's performance may also be addressed. After everything is set up, the electrician will tidy up the workspace, getting rid of any materials or debris from the installation.